Toronto's new hotels: conversions, towers and late openings
Eleven hotels open, ten announced: how Toronto reuses banks, barns and parking lots, and why so many of its hotel dates keep slipping.
By Mathieu Gastal · · 8 min read

Toronto has 21 hotels in our files that opened in the last decade or are still on their way: eleven open, ten announced. The open ones are mostly reuse. A former boarding house on Queen Street East, a Holiday Inn on Bloor, a mid-century apartment hotel and a five-storey building on Mutual Street all became hotels without the site being cleared. The announced ones are a different story, and the most telling thing about them is how many dates have already moved.
The hotels that were something else first
The Broadview Hotel is the clearest case, and the oldest conversion in the group. The building at Queen Street East and Broadview Avenue went up in the early 1890s as Dingman's Hall, a commercial hall with a bank on the ground floor, doctors and lawyers above and two assembly rooms at the top. It became a hotel in 1907, with rooms from $1.50 a night, and by the 1970s it was a weekly boarding house with a strip club downstairs. That club, Jilly's, closed in July 2014, two months after Streetcar Developments and Dream bought the building. The Broadview reopened in July 2017 with 58 rooms after a restoration led by ERA Architects, who rebuilt the black cornices from period photographs. The developers worked with the City and WoodGreen Community Services to rehouse 45 long-term tenants before the work began.
The Anndore House on Charles Street East is a plainer story. Opened in 1955 as an apartment hotel, it ended up a Comfort Hotel before Silver Hotel Group renovated it in 2018, keeping the terrazzo staircases and iron railings. Kimpton Saint George, on Bloor Street West, did the same with a Holiday Inn: Kimpton announced in July 2017 that it would take over the building rather than build new, and opened its first Canadian hotel there on June 19, 2018, with 188 rooms.
1 Hotel Toronto belongs in this group too. It took over the former Thompson Toronto on Wellington Street West, 112 rooms in King West, and gave 1 Hotels its first address in Canada. And Hotel Beebop, at 45 Mutual Street, is the smallest and strangest entry. Castl took a five-storey building, added four storeys and about 18,600 square feet, and opened 48 units in spring 2026. There is no front desk: guests register online, upload a photo ID and let themselves in with a smart lock. There is also no elevator.
Three towers, three different bets
Not every new hotel is a conversion, and the ground-up ones share a feature: the hotel is a small tenant in a residential building.
Nobu Hotel Toronto is the extreme version. It opened on June 1, 2025 on floors 41 to 45 of the west tower of Nobu Residences, with 36 rooms and a key-card lobby separate from the 660 residential units below. It was Nobu Hospitality's first hotel in Canada, and the group's restaurant downstairs had opened ten months earlier. Prices start at CAD 595, the highest published rate of any open hotel in the city.
TOOR Hotel Toronto, at 203 Jarvis Street, reverses the order. The 232 rooms sit in the lower part of a 33-storey tower, and the upper 15 floors hold 181 rental apartments. Manga Hotel Group, which owns and runs it under JdV by Hyatt, built it on a former surface parking lot and says it is the first of four TOOR hotels planned for downtown over five years. It opened in April 2025, about six months after the fall 2024 date first given.
The third is still unfinished, and it is the biggest. Le Méridien Toronto Pinnacle will occupy the first 12 floors of Pinnacle SkyTower, at 1 Yonge Street, with 223 rooms and suites under 958 condominiums. The tower topped out in March 2026 at 106 storeys, which makes it the tallest building in Canada. Marriott's own page now gives January 2027 for the hotel, after earlier targets of fall 2025, spring 2026 and fall 2026. The first residents were expected to move in during the fall of 2026, which suggests the condominiums come first and the hotel after.
When the hotel is the casualty
The lower floors of One Bloor West, the 85-storey tower at Yonge and Bloor, were meant to hold an Andaz of about 160 rooms. Then the project, launched by Mizrahi Developments, went into receivership in October 2023 with more than $1.9 billion in debt. Hyatt's agreement was terminated in 2025, and Tridel took over as project manager on May 1 of that year.
By April 2026 the facade was almost complete and Tridel projected completion in early 2028. The Andaz Toronto floors, 5 to 16 in the 2025 filings, are waiting for a new five-star operator. Consultants for the project estimated that putting a luxury hotel name on the condominiums could add 20 to 56 per cent to their sale price, which explains the search for a five-star operator over a midrange one. No replacement had been named by the spring of 2026.
Freed Hotel and Residences is the other tower in the list that depends on its condominiums. Announced on February 13, 2024 as an $800 million, 63-storey building at Adelaide and Duncan, it promises 100 hotel rooms against 400 condominiums and the first Katsuya in Canada. No construction start has been reported, the fall 2028 date comes from that single announcement, and some pre-construction listings place completion in 2030.
Old buildings still waiting
Several announced hotels reuse existing buildings, at very different stages.
The Curio Collection hotel at 60 Mill Street is the long wait. Easton's Group of Hotels bought the 1890 whisky rack house in the Distillery District in 2018 for 28 million dollars, won new zoning in 2021 and announced the project in January 2022 with a three-year build. The plan keeps the 132-year-old exterior as the first three floors of a 31-storey, 392-room hotel. The listed opening is now late 2026, which the file treats as approximate. One caveat on the brand claim: the project was billed in 2022 as Canada's first Curio Collection, but Revery Toronto Downtown has carried the brand since June 2024, and a Curio hotel already operates in Montreal.
At 69 Yonge Street, Artifact Group bought the 15-storey Canadian Pacific Railway Building in April 2026. Darling & Pearson finished it in 1913, and it was then the tallest building in the British Empire. The previous owner had drawn up a residential scheme that would have added five storeys. Artifact dropped it and plans a Tribute Portfolio hotel of 162 rooms with no added height, a building permit application filed on July 27, 2026, construction due in the first quarter of 2027 and an opening in 2028. Nothing has been published on what survives of the 1913 interior.
The former Toronto Star building at One Yonge is the least advanced. Pinnacle International vacated the 25-storey tower in 2022, then planned to demolish it and instead paused that plan in late 2025 to pursue a hotel. The City adopted Zoning By-law 1041-2026 on July 30, 2026, permitting 487 suites. No operator, brand or date exists, and the neighbouring Redpath site has objected to the hotel use.
On Richmond Street West and Camden Street, Manga Hotels has two 19-storey blocks on a shared base. It started construction in May 2026, seven years after the first zoning filing in 2019. The south facade of a heritage-designated building at 38 Camden is being kept. The 2023 by-law allows 362 suites across the two 19-storey blocks, and a variance filed in July 2026 asks for 392. A city report puts the construction staging permit at August 2026 to April 2029, an outer limit for the build and not a stated opening date. Our files list the project under two addresses, 471 Richmond Street West and 38 Camden Street, and their room counts do not add up to the planning figure. That is why the ten announced hotels at the top include both.
Late is the norm
Set the dates side by side and the pattern is hard to miss. Ace Hotel Toronto was announced in 2018 for a 2019 opening and welcomed guests on July 26, 2022. Hotel X, at Exhibition Place, was first proposed in 1999, saw three attempts fail, and opened on March 20, 2018. TOOR was six months behind. Le Méridien has slipped by more than a year, and Tempo by Hilton at the airport has moved from 2028 to 2029.
Two airport hotels that are not quite Toronto
IHG's voco Toronto Airport West, signed in June 2025 with a 2027 target, has no published address, and the files cannot confirm whether it stands in Toronto or in a neighbouring municipality such as Mississauga. Tempo by Hilton Toronto Airport, the brand's first in Canada, is at 5900 Elmbank Road in Mississauga, about 25 km from downtown. Both are useful for a night between flights and little else.
What the published rates say
Seven of the eleven open hotels publish a starting rate, all in Canadian dollars. The spread runs from CAD 140 at the Broadview to CAD 595 at Nobu.
Hotel Rate from The Broadview Hotel CAD 140 The Anndore House CAD 190 Revery Toronto Downtown CAD 200 Canopy by Hilton Toronto Yorkville CAD 350 Ace Hotel Toronto CAD 360 1 Hotel Toronto CAD 465 Nobu Hotel Toronto CAD 595The cheapest rooms sit in the oldest buildings, and the dearest in the smallest hotel, 36 rooms against the Broadview's 58 and Revery's 224. TOOR, Hotel X, Kimpton and Beebop do not publish a nightly rate in the sources we hold, and none of the ten announced hotels has one.
For more on the city, see the Toronto destination page and the list of upcoming openings.
Hotels in this guide

Toronto
Le Méridien Toronto Pinnacle Hotel
Announced · January 2027
Toronto
Andaz Toronto, Yorkville
Announced · TBC
Toronto
Curio Collection by Hilton Toronto Distillery District
Announced · Late 2026
Toronto
69 Yonge Street, Tribute Portfolio by Marriott
Announced · 2028
Toronto
38 Camden Street
Announced · TBCMore guides
All guides →
17 November 2026 · 6 min read
Singapore's new hotels, 2025 to 2029: conversions and towers
Nine Singapore hotels opened in 2025 and 2026, three of them conversions of older buildings, and ten more are due by 2029. A look at where and why.

12 November 2026 · 9 min read
New York's new hotels in 2026 and towers due by 2028
Five Manhattan and Brooklyn hotels opened between February and April 2026: what they are, what they cost, and the Midtown and SoHo projects due next.

10 November 2026 · 6 min read
Chicago's new hotels: vaults, showroom and casino tower
Five Chicago openings since 2023 and a pipeline to 2028 built mostly from old buildings: a 1912 bank, a 1920s inn, a 1922 showroom and the Bally's tower.