Tampa, Florida

Hotel ORA + Private Residences

A planned 39-story, 658-unit condo-hotel tower in downtown Tampa, sold largely to investors with an 8% guaranteed lease-back rather than run as a flagged hotel.

Announced · TBC
Hotel ORA + Private Residences
  1. Announced
  2. Bookable
  3. Open

Hotel ORA + Private Residences is a planned 39-story condo-hotel tower in downtown Tampa with 627 investor-owned suites and 31 private residences, backed by more than $200 million in presales. Foundation permits were filed in April 2026, but tower cranes are not scheduled until 2027, so the timeline and eventual opening date remain unconfirmed.

The essentials

Group
Independent condo-hotel (developers ARC Realty Group, Prosper Group and Sunwest Construction; no hotel brand or operator affiliation)
Opening
TBC
Rooms & suites
627 hotel suites, plus 31 separate private residences
Segment
Luxury (marketed as five-star)
Designer
Adache Group Architects
Entry rate
NC
Book the best hotels in Tampa →

Get notified when it's bookable

Up to two emails: when Hotel ORA + Private Residences starts taking bookings, and when it opens. Nothing else.

Where is Hotel ORA + Private Residences?

The tower is planned for downtown Tampa, on a three-parcel assemblage just north of the Water Street Tampa development and the Channel District. The address given for the project, 1101 E. Jackson Street, is where the developer's sales gallery operates, open every day of the week with shorter hours on Mondays and Tuesdays.

Hotel ORA + Private Residences: the concept

Developers ARC Realty Group, Prosper Group and Sunwest Construction had booked more than $200 million in presales by November 2025 against a stated $675 million total project cost, with phase one reportedly selling out in 40 days. Crane and foundation permits were filed in April 2026, after groundbreaking slipped from an original March 2026 target to summer 2026, pending final approvals. An FAA filing covers a temporary 250-foot mobile crane for deep-foundation work through mid-2027, while the two permanent tower cranes are not due until March 2027. Above-grade construction on the 39-story tower therefore remains well over a year out even on the current schedule. Marketing materials describe the project as self-funded, and no independent report found discloses a construction loan or outside lender.

The finished building would hold 627 hotel suites on floors 17 through 35 and 31 larger private residences, from 1,414 to 3,070 square feet, on the top four floors. Adache Group Architects is the architect. The suites are studios, one-bedrooms and two-bedrooms with full kitchens, and the project's own site lists them from $649,000.

Buyers of hotel-suite units can opt into a lease-back program guaranteeing 8 percent of the purchase price annually for two years after delivery, paid quarterly and covering housekeeping and guest services, in exchange for a required furniture package priced between $18,000 and $31,000. After two years, owners may sell the unit back to the developer at market value minus a 6 percent fee. Owners can alternatively use the affiliated management company for a 15 percent fee on gross revenue, leaving them 85 percent, or self-manage or hire an outside operator.

Dining and wellness at Hotel ORA + Private Residences

Marketing materials describe a rooftop infinity-edge pool with cabanas and hot tubs, a 10,000-square-foot signature steakhouse, a lobby bar, a European-style café and patisserie, a rooftop restobar with a DJ stage, a full-service spa, an in-house cycle studio, a fitness center, a 24/7 concierge and more than 15,000 square feet of ballroom and convention space. None of these venues has opened or been independently verified beyond developer materials.

Are you the manager of this hotel? Click here to get in touch.

Other hotels in Tampa

Coming soon in Tampa

Iconic hotels in Tampa

Hotel Flor Tampa

Tampa

Hotel Flor Tampa

Opened 1927 as the Floridan · Tapestry Collection by Hilton

Opened in 1927 as the Hotel Floridan, this 19-story tower by architects G. A. Miller and Francis Kennard was Tampa's tallest building for nearly four decades. Its Sapphire Room bar, nicknamed the Surefire Room, was a favorite of WWII airmen training nearby; the hotel closed in 1989 and has since been restored twice, reopening most recently as Hotel Flor Tampa in 2024.

From $300

Learn more →

A new hotel opening, every day

Follow @newhotels.io: one new hotel or city in your feed each day.

Follow on Instagram
Latest on Instagram
  • Los CabosLos Cabos
  • ParisParis
  • CancúnCancún
QR code for the NewHotels.io Instagram accountScan to follow